BuildCalcs

Concrete Slab Calculator — Yards, Bags & Cost

Who this is for: For contractors and serious DIYers pricing a pour this week — shed pads, patio slabs, and one-car garage floors where you need the yardage and the bag math before the truck shows up.

Enter slab length, width, and thickness — get cubic yards, 80-lb bag count, and a cost ballpark. Built for shed pads, patios, and garage floors.

Quick answer: Slab volume = length × width × thickness ÷ 27. A 10×12 ft slab at 4 inches is 1.48 cubic yards (order 1.6 with waste) — about 50 eighty-pound bags per yard, so pours over roughly 1 yard usually go ready-mix.

ft
ft
in

4 in patios & sheds · 5-6 in vehicle slabs

%

10% standard · 15% broken forms

Yards + 10% waste
1.63
exact: 1.48 yd³
80-lb bags
74
with waste included
Cubic feet
44.0
exact: 40 ft³
60-lb bags98
40-lb bags147
Ready-mix order (rounded up ¼ yd³)1.75 yd³
Bag yields per manufacturer published coverage (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³). Pours over ~1 yd³ usually cost less from a ready-mix plant. Ballpark tool — confirm quantities with your supplier.
Core facts
FormulaL ft × W ft × thickness in ÷ 12 ÷ 27 = cubic yards
80-lb bag yield0.60 ft³ per bag (≈45 bags/yd³)
60-lb bag yield0.45 ft³ per bag (≈60 bags/yd³)
Default waste10%
CompiledSeptember 2026

How does this concrete slab calculator work?

Volume for a rectangular slab is length × width × thickness, divided by 27 to reach cubic yards — the unit ready-mix plants sell by. The calculator adds your waste factor (10% covers uneven subgrade and spillage) and converts the result into bag counts using published yields: an 80-lb bag yields about 0.60 ft³, a 60-lb about 0.45 ft³. Rule of thumb from the output: a 10×12 slab at 4 inches is about 1.5 yards — roughly 67 eighty-pound bags, which is exactly where bag-carrying stops making sense and a ready-mix truck (or a trailer of volumetric mix) pays for itself.

Common uses

  • Sizing a shed pad or patio pour before ordering ready-mix
  • Comparing the bag count against a truck's minimum-load charge
  • Checking a subcontractor's yardage figure against your own numbers
  • Budgeting material cost with a defensible waste factor

Frequently Asked Questions

How many yards is a 10×12 slab at 4 inches?
10 × 12 × (4/12) = 40 ft³ ≈ 1.48 cubic yards. With a 10% waste factor, order 1.6 yards — most contractors round up to the nearest half yard, so 1.5–2 yards depending on the plant's minimum.
How many 80-lb bags make 1 yard of concrete?
One cubic yard is 27 ft³; an 80-lb bag yields about 0.60 ft³, so 27 ÷ 0.60 = 45 bags per yard before waste. With 10% waste, plan on 50 bags per yard — the number that usually convinces people to call the ready-mix plant.
Should I use 4 inches or 6 inches for a slab?
4 inches is the standard for patios, walkways, and shed pads; 5–6 inches with rebar is the usual spec for vehicle traffic — car lifts, RVs, or full-size trucks. The calculator takes any thickness, but the thicker section changes both volume and reinforcement, not just cost.
What waste factor should I use?
10% is the working default for formed slab work — it covers subgrade unevenness, spillage, and the heel of the load that stiffens in the wheelbarrow. Steep or broken-form pours go 15%.
Is the cost figure a quote?
No — it's a national ballpark compiled September 2026 from published cost guides. Ready-mix prices swing hard by region and fuel; get a local quote for anything you'll sign.

More concrete calculators